Design and implementation of an energy management system for hybrid renewable generation and battery storage systems
Milestone 4.1. Development of a planning tool for optimal BEES sizing
Tasks
- Analysis of existing planning tools on the market
- Development of a tool for optimal hybrid system planning
- EMS comparison in system planning
Participants: Research Groups GCP and GHEODE
Milestone 4.2. Design and simulation of the energy management system for the operation of the hybrid system
Tasks
- Design and simulation of BEES power control system
- Design and simulation of the power control system of renewable generators
- Design and simulation of the plant control system for synchronous gensets
- Design and simulation of energy management system
- Design and simulation of the microgrid voltage-reative regulation system
Participants: Research Groups GCP, GHEODE and GEA-IIT
Milestone 4.3. Implementation and experimental validation of the EMS
Tasks
- Implementation of local controllers
- Implementation of EMS
- System testing
- Integration of the energy management system into a SCADA system of the microgrid
Participants: Research Groups GCP, GEISER and IMDEA-SEIL